Project Description

Work Completed

• Replaced concrete sleepers in designated worksite (1 in 3)

• Regulated ballast

• Tamped worksite

• Brushed Worksite

• Changed rails throughout the worksite (30ft/60fts)

• Removed any scrap i.e. sleeper/smalls/spoil

Worked alongside NWR to ensure volumes quota was met in a safe manner during restricted possession times


Client

Network Rail (NWR)

Brief

Re-Sleeper works