WHL Culvert Drainage Renewal Works

All Project Profiles

Project Description

Work Completed

  • Installed Pre-Cast Slabs & Headwalls up to 2Ton in weight
  • Installed steel pipes
  • Regulated ballast
  • Delivered materials and plant from access to worksite
  • Assisted 5T excavator with digging in the worksite where required
  • Removed spoil and scrap materials from the worksite


Client

Westin Rail Ltd

Brief

Drainage Renewal Works